Past Projects

These are real installations, not renderings. From para-rigging units to Coast Guard stations to Special Forces dive schools, each project started with the same problem: not enough space, not enough order. Here’s how it got solved.
Worktables, Carts, and Racks

Air Force Para-Rigging Unit Expands Capacity with Purpose-Built Worktables, Carts, and Racks

A para-rigging unit had new parachutes coming in, aging worktables wearing out, and no extra square footage to spare. See how purpose-built tables, racks, and carts helped create a safer, faster chute-packing workflow. 
Read More

May 22nd, 2026
Georgia National Guard Maintenance Facility

Storage Overhaul Strengthens Workflow at a Georgia National Guard Maintenance Facility

Gear was stacking up. Workstations weren’t keeping pace. This project helped a National Guard maintenance team create cleaner workflows, stronger accountability, and more usable space without losing sight of the mission.
Read More

May 22nd, 2026
Base Library Upgrade

Base Library Upgrade Improves Visibility, Access, and Community Use

Tall shelves and tight aisles were making this base library harder to navigate, monitor, and use. See how a smarter layout turned a crowded stack room into a brighter, more accessible community resource.
Read More

May 22nd, 2026
Armory Storage Overhaul

Armory Storage Overhaul Improves Access, Visibility, and Accountability at a Southeast U.S. Facility

No more digging through ten cases to find one item. This armory overhaul gave weapons, gear, tools, and accessories a clearer home, helping the team move faster and manage accountability with a lot less guesswork.
Read More

May 6th, 2026
Helmet-Ready Storage and Integrated Charging

Flight Test Squadron Upgrades Locker Room with Helmet-Ready Storage and Integrated Charging

Outdated lockers were putting high-value flight gear at risk. Patterson Pope helped this squadron build a cleaner, smarter locker room with helmet-ready storage, integrated charging, and room for mission needs to keep evolving.
Read More

July 2nd, 2025
Modernized IPE Counter System

Modernized IPE Counter System Improves Gear Issue Workflow, Visibility, and Efficiency

Gear issue should not feel like a scramble at a folding table. This project turned a dated IPE counter into a cleaner, more cohesive setup built for visibility, communication, and smoother daily flow.
Read More

May 22nd, 2026
Modern Parachute Storage

Modern Parachute Storage Helps a Southeast Airborne Unit Improve Safety, Flow, and Readiness

Bent wire cages, forklift shuffling, and hard-to-read rotation tags were slowing the whole chute cycle down. Patterson Pope helped create a powered, purpose-built storage system that moves parachutes from shelf to sky with less handling.
Read More

May 22nd, 2026
Multi-Zone Storage Overhaul

Multi-Zone Storage Overhaul Elevates Readiness at a Southeast Coast Guard Station

This Coast Guard station had multiple missions and one big storage problem: the space wasn’t keeping up. See how upgraded equipment rooms, workstations, and lockers helped crews move faster, and keep response readiness on course.
Read More

May 19th, 2026
Rust-Resistant Lockers

Special Forces Dive School Upgrades to Rust-Resistant Lockers Built for Gulf Coast Conditions

This locker room needed to survive the one opponent that never clocks out: saltwater. The new system brought stronger ventilation and corrosion-resistant storage to a mission where equipment reliability matters.
Read More

June 18th, 2025
Parachute Storage Upgrade

Parachute Storage Upgrade Improves Mobility, Capacity, and Transport Efficiency for a Southern Reserve Unit

Parachutes were stacked, boxed, and hard to move at mission speed. This Reserve unit upgraded to rugged parachute containers that improved capacity, protected gear, simplified tracking, and made transport safer from storage to staging.
Read More

May 17th, 2026
Purpose-Built Textile Storage

USS Yorktown Museum Improves Historic Flag Preservation with Purpose-Built Textile Storage

Preserving history gets tricky when the storage room is inside a warship. Patterson Pope helped the USS Yorktown team fit textile racks around shipboard obstacles while protecting ceremonial flags from creasing, compression, and moisture damage.
Read More

May 28th, 2026
Marine Dive Training Facility

Purpose-Built Storage Improves Daily Workflow at a Marine Dive Training Facility

Gear storage, classroom work, admin tasks, and equipment staging were all fighting for the same floor space. This project transformed a cramped multipurpose room into a flexible training environment with dedicated gear storage, clearer zones, and room to work.
Read More

July 22nd, 2026